COLD WORK PERMIT

COLD WORK PERMIT

Insulated sandwich panel/ composite building panels


Permit to work

NO WORK is permitted on Insulated Sandwich Panels (ISP) or any other composite building panels that have a combustible core material, without a Permit.

NO HOT WORK IS TO BE UNDERTAKEN DIRECTLY ON THE PANELS.


Required Precautions (Hot Work)


Required Precautions (Checklist)


Operator

I understand that I am authorized to undertake works on Insulated Sandwich Panels in strict accordance with the required precautions.


Sign Here

Authorisation

I verify the above location has been examined, the precautions
under the required precautions have been examined and permission
is authorised for work.
This permit is being issued by a person authorised to do so. The
Authorised Nominee (if required) is appropriately experienced in risk
assessment and site process hazards.
If a contractor is undertaking the work - I have sighted the
contractor’s insurances and acknowledge that they are current.


Signature of issuer
Signature of issuer

Permit Expiration

A cold works permit is only valid for 8 hours, or no more than one
shift. If the work will take more than 8 hours or one shift, a separate
permit is required for each period. This cold works permit must also
be prominently displayed on the job-site.


Final Checks

I have checked the location between thirty (30) and ninety (90)
minutes after completion of the work and I am satisfied that the work
has been carried out in a safe manner and there is no residual fire risk.